ROAD AND TRAFFIC INDEX
Lemery, Batangas
LEMERY, BATANGAS
SURVEYED PAVEMENT DISTRESS IN VILLAVICENCIO/PROGRESO STREET
Defect(s)/Deficiencies Estimated Quantity Unit of Measure Remarks Length Width Depth No. of Slab Latitude Longitude
Total: 47
Rehabilitated Slab 1 13.88672 120.9113
Wornout Surface 55.8 sq. m 2 13.88688 120.9115
4 13.886814 120.911349
Longiitudinal Crack 6.83 l.m 6.83m 4 cm 2.5 cm 6 13.88678 120.9113
Spalling 0.33 sq. m 3m 11cm 1.2 cm 13 13.88646 120.9112
Transverse Crack 6 l.m 6m 5.19 cm .7 cm 16 13.88654 120.9108
Longitudinal Cracking 10. 97 l.m 10.97 m 7cm 1 cm 17 13.88656 120.9108
22 13.886644 120.911085
Longitudinal Cracks 40.5 l.m 9 slab 5 cm 3.5 cm 17 13.88656 120.9108
Joint Spalling 0.06 sq. m 1.2 m 25 13.88638 120.9111
ravelling 0.9 sq. m 2.5 m 36cm 7 cm 27 13.88637 120.9108
Popouts 27.9 sq. m 32 13.88636 120.9111
Ongoing Drainage Repair; Filipinismo St/Co 33 13.88619 120.9103
/E 47 13.88624 120.911
Note: Legend: /E - End
1. The data is surveyed last February 23, 2022. /Co - Corner
2. The unit of measure l.m denotes linear meter.
CONTACT US
GOVERNMENT DIRECTORY
Lemery Engineering Office,
Ilustre Ave., Lemery, Batangas
pmsgislemery@gmail.com